Archive for the ‘Steel Bridge’ Category

Steel Bridge

The Steel Bridge team has worked hard this semester on the design of the 2009 bridge. Things have wrapped up for the semester, but we will start fabrication in Jan. For more information, please contact Nicole Serafin at serafin.n (at) neu (dot) edu .

Posted by Nicole Serafin on December 12th, 2008 Comments Off

Steel Bridge

Steel Bridge is up and going. The team is currently in the design phase, and is working on several different concepts.  They are in the process of narrowing down the possibilities, and choosing a final design. The goal is to have a finalize concept before winter break, so fabrication can start in Janurary.

The next three meeting will be on 11/24, 12/2,  12/4, all at 6pm in the ASCE office.

For more information please take a look at the Steel Bridge page, or check out the rules for 2009 here.

If you are interested in participating with the team please contact Nicole Serafin at Serafin.n [at] neu [dot] edu.

Posted by Nicole Serafin on November 24th, 2008 Comments Off